The furnace room of our house is huge (almost 12 by 16 feet), so we decided to move our laundry into that space to allow for more livable space in the rest of the basement. The room started with furnace, water heater, water softener in an un-insulated room.
These before pics show the dryer moved approximately into place, and the water softener didn't move, and a new furnace replaced the old one. Otherwise everything else is pretty much changed/new. (note to self : take better 'before' pictures).
First picture: Looking into the room, furnace on the right and then the water heater (just made it into the pic) and then there is a door past there leading to the cold cellar. On the left there is the water softener, then exhaust going up the chimney and then the dryer.Second pic is taken standing in front of the cold cellar door looking out of the room (you can see the water heater/furnace exhaust and the water softener in the corner.
So now what we did with the room
When we got the new furnace, we had the water heater moved next to the water softener (under the big water rust stain - I believe this was a result of a old damaged chimney liner, we have a new one so no more damage will continue). This also got rid of the exhaust pipe that went across the room which makes the room instantly feel MUCH bigger.
We used the furnace install as an opportunity to put down a piece of vinyl flooring. Its cheap, washable, and has no seams to deal with for install. We choose a in store option from Home Depot, the pattern looks like tiles. We might have been able to get something awesome if we special ordered it but we wanted to take it home with us right away and its fine. Sometimes less choice is better because then you can make a decision faster based on the two available options.
We framed and insulated the two exterior walls. We left the two interior concrete walls as is. We choose not to finish the ceiling since its a utility room and then we still have access to plumbing/gas/etc.
This could still be done at a later date.
New plumbing was added for the laundry and relocated water heater. This allowed us to slowly start replacing some of the old steel water lines and replace them with copper. They were pretty corroded and we have been told that by replacing them we should be able to improve our water pressure (once the pipes aren't full of gunk).
New electrical was also added for the laundry, dryer and some regular outlets.
While we were doing the work in the laundry room, the rest of the partially finished basement was being demolished. The room had 1inch white styrofoam 'insulation' behind wood paneling. I took this opportunity to put some sweet wood panelling in the laundry room.
1) It was free.
2) It prevented it from going to the dump.
3) It was essentially already cut to size.
4) It was easier than drywall since we wouldn't have to tape/mud/sand.
5) I was going to paint it.
6) Its a laundry room so it doesn't have to be a show room
Result - I love the painted panelling!
I have decided to paint the main part of the basement (currently under construction) a charcoal grey. So I painted the laundry room a nice light warm grey. The two colours are 'revere pewter' and 'kendall charcoal' from Benjamin Moore - and then colour matched and mixed at Home Depot.
The cold cellar door - was doctors office green, now charcoal grey. Love it.
The cold cellar door - was doctors office green, now charcoal grey. Love it.
The baseboards are wood, and not mdf, just since there is potential for flooding since its a basement and a laundry room. Once mdf gets wet its over. We bought primed finger joint pine and it seemed in the comparable price range although I can't remember the prices and might have just convinced myself. Buying primed was so much easier. Its pretty substantial baseboards but we are trying to match with the era of the house and the original woodwork on the main floor. (the new stuff is just 1 x 6 's with a quarter round along the floor but its pretty close).
Currently there is a square folding table with some boards on it. Still not totally sure where a table should go in the room. where it is or as a continuation to the sink. So thats still in process. I plan to build some table something with the wood - which matches the shelves on the wall.
We hung some shelves on the far wall. They were in the pile of stuff to potentially be thrown out and so I used them. They have a nice warmth to the stain and work perfectly. The brackets seemed kinda expensive for free shelves but probably still cheaper than buying the whole assembly. (I think they were $9 each).
The stuff on the shelves doesn't look too pretty, maybe I should have opted for closed storage, then again this is a utility room. I plan to get a few more boxes/baskets for organization and appearance.
You probably notice that there is no faucet on the laundry sink. Its not a priority yet, so nothing has been done. I don't want a basic utility one and the thought is to use the one from our current kitchen when we upgrade it. Yes I love re-using thing.
The window should be replaced in the near future, complete with window ledge and trim.
And of course my new etched mirror is hung.
So there is no door yet, we haven't made a final decision about what we will put there, re-use a door from the main floor? buy a new door? make our own barn style sliding door?
There is still some finessing that needs to be done, but if I waited until it was perfect then you would probably never see it!
- Lauren